• Power Grid: Brazil/Spain and Portugal (Recharged Version)
  • Power Grid: Brazil/Spain and Portugal (Recharged Version)
  • Power Grid: Brazil/Spain and Portugal (Recharged Version)

Game Details Players: 2 to 6 Age: 12 and up Time: 120 minutes
Publisher: Rio Grande Games Designer(s): Friedemann Friese


Power Grid: Brazil/Spain and Portugal (Recharged Version)

Ref: PGMAP04REC
MYR129.00 MYR119.00

Expansion maps for the Power Grid (Recharged Version) game - Brazil and Spain/Iberia maps. Unlike previous map sets, this one comes in a box, so you can use it to store other maps.

Part of the POWER GRID Game Series.

Note: This is an expansion game and requires the Power Grid board game to play. This is not a complete game by itself.


Weight (kg): 2.0
BGC Marks Earned+119 (what is this?)
addthis


Two new expansion maps for Power Grid: Brazil on one side and Spain & Portugal on the other.


In Brazil, power providers prefer biogas for the production of electricity. Thus, players should consider the garbage power plants as biogas-fired power plants and the garbage resources as biogas tanks when playing with the Brazil maps. The fight for scarce resources is intense and will keep the players focused during the game!

In Spain & Portugal, the interests of power production develop in two completely opposite directions: Uranium will be much more important than in other games, however not at the beginning. The resource market will not get any new uranium at all during »Step 1«, but the supplies of uranium increase rapidly in »Step 2«. On the other hand, and at the same time, three large wind-power plants come onto the market. This clash of interests is intended!

The expansion includes a "Collector's Box" - a standard sized Power Grid box with space for the other expansion maps.